SmartBuildSupply & Service Inc.
All services / Toronto & GTA

Complete Bathroom Renovations

Waterproofing, tile, plumbing, fixtures, and finishing by one team.

Compact vanity and faucet installation

Scope of work

What we handle

We rebuild bathrooms from demolition to final fixture installation.

Your estimate confirms the work and materials included.

  • 01

    Tile & Stone Work

    Floor-to-ceiling tile installation, feature walls, shower surrounds, and custom mosaic details.

  • 02

    Custom Shower & Tub

    Walk-in showers, freestanding tubs, and frameless glass enclosures built to precise measurements.

  • 03

    Vanity & Storage

    Custom floating vanities, dual sinks, linen towers, and built-in niche shelving.

  • 04

    Plumbing Upgrades

    Full plumbing replacement, rain shower heads, heated floors, and body spray systems.

  • 05

    Lighting & Mirrors

    LED mirror integration, pot light layout, and task lighting for a bright, spa-like atmosphere.

  • 06

    Waterproofing

    Professional waterproofing membrane systems behind every tile surface — no shortcuts.

From plan to completion

How the work moves forward

  1. 01

    Design Consultation

    Review your current bathroom, discuss layout changes, style direction, and functional priorities.

  2. 02

    Layout & Selection

    Finalize tile, fixtures, vanity, and hardware selections with guidance from our team.

  3. 03

    Demolition

    Full removal of existing tile, fixtures, and drywall where required — clean and contained.

  4. 04

    Waterproofing & Rough Work

    Waterproof membrane installation, plumbing rough-in, and electrical updates.

  5. 05

    Tile & Fixture Installation

    Precision tile work, vanity installation, shower glass, and fixture connections.

  6. 06

    Final Walkthrough

    Hardware, accessories, touch-ups, and a thorough walkthrough with you at completion.

Common questions

Before you begin

How long does a bathroom renovation take?

A standard bathroom renovation takes 2–3 weeks. A larger ensuite with custom work can take 3–4 weeks. We give you a firm timeline before starting.

Can you tile floor-to-ceiling?

Absolutely. Full-height tile is one of the most requested upgrades — it looks stunning and simplifies cleaning. We'll recommend formats and patterns that work best for your room dimensions.

Do you move plumbing walls?

Yes, though moving drain locations involves more work and cost than moving supply lines. We assess each project individually and give you honest advice on whether a layout change is worth the cost.

What's the difference between a refresh and a full renovation?

A refresh might include new tile, fixtures, and paint while keeping the existing layout. A full renovation involves gutting the space and rebuilding from the waterproof layer up — the right choice depends on your goals and budget.

Get a Free Estimate

Tell us about your project.

Share your location and goals. We’ll arrange a site consultation.

  • Written scope and estimate
  • Coordinated project schedule
  • 2-year workmanship warranty

We respond within 1–2 business days.

Get a free estimate Save contact